Triple Offset Valves used as Isolation Application

Can Triple Offset Butterfly valve used as isolation application?
Many engineers are not aware Triple Offset Butterfly valve can be used as isolation valve, and it benefit in term of saving in weight, space and most importantly, cost.



Triple Offset Valves in Upstream Applications





Triple offset valves provide an efficient solution for critical and non-critical applications when positive isolation is required in upstream oil and gas operations. Their compact nature offers savings in weight and space and most importantly, cost.
Most onshore and offshore installations traditionally use ball valves and occasionally gate valves for the majority of flow isolation applications. Specifications typically call for 6D valves, but engineers seldom look beyond these specifications to other valve types with similar or better performance.
Many of these engineers are not yet aware that in many offshore isolation applications, a triple offset valve (TOV) offers benefits in terms of weight, overall dimensions and performance versus the standard ball or gate valve. A TOV can be the right choice for applications in the turret of a floating production storage and offloading vessel (FPSO), and in virtually all topside process applications of FPSOs and platforms such as separators, water treatment, gas compression and other systems.
Today’s TOVs, with pressure ratings up to ASME Class 1500 and zero leakage, cover enough applications to achieve significant savings in weight and space, as well as total cost of ownership.

Thursday, February 6, 2014

Oil and Gas Processing (History)

Oil has been used for lighting purposes for many thousands of years. In areas where oil is found in shallow reservoirs, seeps of crude oil or gas may naturally develop, and some oil could simply be collected from seepage or tar ponds.

Historically, we know the tales of eternal fires where oil and gas seeps ignited and burned. One example is the site where the famous oracle of Delphi was built around 1,000 B.C. Written sources from 500 B.C. describe how the Chinese used natural gas to boil water. The oil was produced from bamboo-drilled wells in China. The well reach 1000 meters deep.


In western history, it was not until 1859 that "Colonel" Edwin Drake drilled the first successful oil well, with the sole purpose of finding oil. The Drake Well was located in the middle of quiet farm country in northwestern Pennsylvania, and sparked the international search for an industrial use for petroleum.


Photo: Drake Well Museum Collection, Titusville, PA

These wells were shallow by modern standards, often less than 50 meters deep, but they produced large quantities of oil. In this picture of the Tarr Farm, Oil Creek Valley, the Phillips well on the right initially produced 4,000 barrels per day in October, 1861, and the Woodford well on the left came in
at 1,500 barrels per day in July, 1862.

The oil was collected in the wooden tank pictured in the foreground. As you will no doubt notice, there are many different-sized barrels in the background. At this time, barrel size had not been standardized, which made statements like "oil is selling at $5 per barrel" very confusing (today a barrel is 159 liters). But even in those days, overproduction was something to be avoided. When the "Empire well" was completed in September 1861, it produced 3,000 barrels per day, flooding the market, and the price of oil plummeted to 10 cents a barrel. In some ways, we see the same effect today. When new shale gas fields in the US are constrained by the capacity of the existing oil and gas pipeline network, it results in bottlenecks and low prices at the production site.

Soon, oil had replaced most other fuels for motorized transport. The automobile industry developed at the end of the 19th century, and quickly adopted oil as fuel. Gasoline engines were essential for designing successful aircraft. Ships driven by oil could move up to twice as fast as their coal-powered counterparts, a vital military advantage. Gas was burned off or left in the ground.

Despite attempts at gas transportation as far back as 1821, it was not until after World War II that welding techniques, pipe rolling, and metallurgical advances allowed for the construction of reliable long distance pipelines, creating a natural gas industry boom. At the same time, the petrochemical industry with its new plastic materials quickly increased production. Even now, gas production is gaining market share as liquefied natural gas (LNG) provides an economical way of transporting gas from even the remotest sites.

With the appearance of automobiles and more advanced consumers, it was necessary to improve and standardize the marketable products. Refining was necessary to divide the crude in fractions that could be blended to precise specifications. As value shifted from refining to upstream production, it became even more essential for refineries to increase high-value fuel yield from a variety of crudes. From 10-40% gasoline for crude a century ago, a modern refinery can get up to 70% gasoline from the same quality crude through a variety of advanced reforming and cracking processes.

1 barrel (42 gallons) crude oil breakdown to various products in gallon

Chemicals derived from petroleum or natural gas – petrochemicals – are an essential part of the chemical industry today. Petrochemistry is a fairly young industry; it only started to grow in the 1940s, more than 80 years after the drilling of the first commercial oil well.

During World War II, the demand for synthetic materials to replace costly and sometimes less efficient products caused the petrochemical industry to develop into a major player in modern economy and society.

Products Flow Chart of Petroleum Based Feedstocks

Before then, it was a tentative, experimental sector, starting with basic materials:

  • Synthetic rubbers in the 1900s
  • Bakelite, the first petrochemical-derived plastic, in 1907
  • First petrochemical solvents in the 1920s
  • Polystyrene in the 1930s
And it then moved to an incredible variety of areas:

  • Household goods (kitchen appliances, textiles, furniture)
  • Medicine (heart pacemakers, transfusion bags)
  • Leisure (running shoes, computers...)
  • Highly specialized fields like archaeology and crime detection
With oil prices of $100 a barrel or more, even more difficult-to-access sources have become economically viable. Such sources include tar sands in Venezuela and Canada, shale oil and gas in the US (and developing
elsewhere), coal bed methane and synthetic diesel (syndiesel) from natural gas, and biodiesel and bioethanol from biological sources have seen a dramatic increase over the last ten years. These sources may eventually
more than triple the potential reserves of hydrocarbon fuels. Beyond that, there are even more exotic sources, such as methane hydrates, that some experts claim can double available resources once more.

With increasing consumption and ever-increasing conventional and unconventional resources, the challenge becomes not one of availability, but of sustainable use of fossil fuels in the face of rising environmental impacts, that range from local pollution to global climate effects.


Reference sources:
  1. Oil and gas production handbook: 
    An introduction to oil and gas production,
    transport, refining and petrochemical 
    industry
    . 
    Håvard Devold, 2013

Saturday, January 25, 2014

PSV Inlet Line 3 Percent Rule



When I was young process engineer, I learnt sizing of pressure relief valve, include inlet line sizing rule:
API RP 520 Part II (Ed 2003), section 4.2 recommends that the total non-recoverable pressure loss between the protected equipment and the pressure relief valve should not exceed 3 percent.



WHY?
In API RP 520, section 4.2 "PRESSURE-DROP LIMITATIONS AND PIPING CONFIGURATIONS"
"Excessive pressure loss at the inlet of a pressure-relief
valve can cause rapid opening and closing of the valve, or
chattering. Chattering will result in lowered capacity and
damage to the seating surfaces."

"When a pressure-relief valve is installed on a line directly
connected to a vessel, the total non-recoverable pressure loss
between the protected equipment and the pressure-relief
valve should not exceed 3 percent of the set pressure of the
valve except as permitted in 4.2.3 for pilot-operated pressure relief
valves."

"Keeping the pressure loss below 3 percent becomes progressively
more difficult at low pressures as the orifice size of a
pressure-relief valve increases. An engineering analysis of the
valve performance at higher inlet losses may permit increasing
the allowable pressure loss above 3 percent."

Clearly, the API guideline is to avoid the PSV chatter.
In 2007, API is responded that the 3% rule is under investigation:[1]


In March 2010 Ballot outlines: [2]
- Typical blowdown set by the manufacturer for PRVs is 7 to 12% of the set pressure 
- Original basis of 3% inlet pressure loss was related to blowdown settings in the range of 4 - 5 %
- A suitable margin relative to the blowdown shall be specified by the user
- When exceeding 3% inlet loss, an engineering analysis shall include but is not limited to the following:
a. Verification from the manufacturer the minimum blowdown value for the PRV model based on the manufacturer’s standard setting. 
b. Prior to any increase in blowdown to allow for higher inlet pressure drop, the manufacturer shall be consulted to make sure that an increase in blowdown is possible.
c. Re-evaluation of the flow capacity of the valve taking into consideration the reduction in pressure at the inlet to the valve.
d. The user shall conduct a thorough review of the valve’s inspection/maintenance records and obtain experience from Operations, to identify any indications of chatter

History of Inlet Pressure Drop
- API RP 520 introduced maximum PRV inlet pressure drop in 1963
- API sponsored 1940’s work at University of Michigan by Sylvander and Katz “The Design and Construction of Pressure Relieving Systems”
- University of Michigan Press (1948) pages 72-73 excerpts:

  • “Pressure drop through inlet piping has a two-fold importance in relief system design. First, flow capacity varies with the pressure drop available. Second, the operating characteristics of many relief devices indicate that improper pressure drop on the inlet side may cause intermittent operation.“
  • “For a relief valve having approximately 4 per cent blow-down (that is, the valve will snap shut when the pressure has decreased to 4 per cent below the opening or set pressure), these recommendations are made:

- Combined pressure loss of 3% maximum related to PRVs with 4% blowdown (margin of 1%)


In Spring 2011Metting [3]

In November 2011, Hydrocarbon Processing featured a Special Report [5] Title : "Relief Device Inlet Piping: Beyond the 3 Percent Rule"


Current status, (3/7/2013), API RP520 Part 2, 6th Ed Committee Draft [4]
PSV Inlet Pressure Loss Criteria:
The total non-recoverable
pressure loss between the protected equipment and the pressure-relief valve should not exceed 3 percent of
the pressure relief valve set pressure except as noted below: 
  • Thermal relief valves
  • Remotely sensed pilot operated relief valves
  • keeping the pressure loss below 3 percent becomes progressively more difficult at low pressures as the orifice size of a pressure relief valve increases
  • An engineering analysis is performed for the specific installation



Reference link
1. API replied
2. Spring 2010 API CRE Meeting
3. Spring 2011 API Meeting Minutes
4. API RP520 Part 2, 6 Ed, Committee Draft
5. Relief Device Inlet Piping: Beyond the 3 Percent Rule, Hydrocarbon Processing, Novmber 2011 issue

Thursday, January 9, 2014

Gas Density Calculation (Estimation)

Quick estimation of gas density

Density = P/(RT)   (kg/m3)
P= Pressure (Pa)
R= Individual gas constant (J/kg.K) = Ru/MW
T= absolute temperature (K)
Ru= Universal gas constant (8314.472 J/kmol.K)
MW= Gas Molecular weight

Example:
Air molecular weight = 29 kg/kmol
Pressure = 1 bara = 100,000 Pa


Sunday, June 2, 2013

Control Valve : Selection of Flow Characteristic

Control valve selection of characteristic for Quick Opening, Linear and Equal percentage.





The differential pressure drop proportional to flow squared.

Reference:
1. Fisher Control Valve Handbook (4th Edition). Link: http://www.documentation.emersonprocess.com/groups/public/documents/book/cvh99.pdf

Monday, June 8, 2009

Gas Compression at Offshore (Part 1)

The main purpose of gas compression at offshore are below:
  1. Gas Export
  2. Gas Injection to well
  3. Gas lift
  4. Fuel gas
Compressors are generally classified as reciprocating or centrifugal machines. Reciprocating compressors are generally very robust design. However centrifugal compressors have fewer moving parts and reliable.

Reciprocating Compressor

Reciprocating compressor use positive displacement principle. Generally, reciprocating compressor has low speed compared with a centrifugal compressor


Single acting compressor


Double acting compressor

Double acting compressor has suction and discharge stoke at same time. For every cylinder stoke, one side of compressor discharges compressed gas while the other opposite side is on the suction stoke and vice versa.

Continue with:
Gas Compression at Offshore (part 2)

Friday, May 1, 2009

Artificial Lift

Production wells are free flowing. When a well pressure has declined to the point at which the well no longer produces by its natural pressure. Some artificial methods are: (Beam pump, Electrical Submerged pump and Gas lift)


Beam Pumps

Also called as Donkey Pumps ,are most common artificial lift system used in land based. A motor drives a reciprocating beam, connected to a polished rod passing into the tubing via a stuffing box. The sucker rod continues down to the oil level and is connected to a plunger with a valve.

On each upward stroke, the plunger lifts a volume of oil up and through the wellhead discharge. On the downward stroke it sinks (it should sink, not be pushed) with oil flowing though the valve.


Advantages:

  1. Can be used for wide range production capabilities
  2. Can produce most wells to depletion at limited rates and depths
  3. Highly reliable and relatively easy to analyse by using several different means
  4. Corrosion and scale problems easily treated
  5. Can produce high temperature or viscous oil
  6. Low cost production operation

Disadvantages:

  1. Installation not suitable for crooked hole work
  2. Depth and volume limited by rod weight and strength
  3. High gas-oil ratio wells as well as sand and paraffin content in production fluids
  4. Weight and size can prohibit use in offshore installations

Electrical Submerged Pumps (ESPs)

A motor driven centrifugal pump with rotating blades on a shaft on the bottom of tubing.


Advantages:
  1. Can be operated in deviated or directionally drilled wells although recommended operating position is in straight section of well
  2. Can be operated in deep wells with small casings
  3. Very efficient and economical

Disadvantages:

  1. Narrow producing range
  2. Large volumes of gas can be destructive to the pump
  3. Run life adversely impacted by poor quality electric power supply


Gas Lift

High pressure gas is injected into the production fluids within the tubing string. Leads to decrease in the weight of the fluid column and permits the well to flow.

When the gas lift is started up, several gas lift valves must operate in sequence. During the unloading process, the fluid in the annulus between the tubing and the casing is displaced, along with the high pressure injection gas, through the top gas lift valve into the tubing bore.


Advantages:

  1. Simple to operate
  2. Equipment used is relatively inexpensive
  3. Flexible
  4. Both high volumes and low volumes can be produced
  5. Effective handling of corrosion and high gas-oil ratio production
  6. Low operating costs
  7. Lower failure rate

Disadvantages:

  1. Source of high pressure gas must be available
  2. Not cost effective when used for one-well lease or small fields
  3. Not very effective for producing deep wells where there is high drawdowns or low bottomhole pressures
  4. Accurate gas measurements are not easily obtained
  5. Surging flow can be a source of operating problems with surface equipment

Wednesday, February 18, 2009

Oil and Gas Processing (Gas Section)

Figure 1: Typical PFD of Oil and Gas Processing

The typical process flow diagram (PFD) of oil and gas processing for most of fixed or floating offshore production. Two sections consists crude oil stabilisation and associated gas compression.
This section is continue to discuss the gas processing part in offshore production platform. The HP-MP-LP Separators separate gas from oil. The gas from LP and MP Separators will be recompressed by small compressor driven by electric motor. The re-compressed gas co-mingle with the gas from HP Separator. The gas send to HP Compression train for sale gas, gas lift or gas injection.
The HP Compression train included gas scrubber, gas cooler, anti-surge recycle and driver (gas turbine, steam turbine or electric motor). The gas compressed to higher pressure via several stages of compressors. Each compressor is driven by same shaft. Number of stage compressor is depended on final discharge pressure and compression ratio of compressor. The common compression ratio is maximum 4.
The imperial practice is equal compression ratio of each stage HP Compressor due to high efficiency and cost effective.
The gas treatment system allocate at interstage HP compression train. They are Gas Dehydration, Mercury Removal, Gas Sweetening, Hydrocarbon Dew-point Control Unit, or Natural Gas Liquid Recovery Unit. The gas treatment system depend on gas export requirements.
The treated gas is exported via gas flowline or LNG/CNG tanker to onshore processing plant.


Figure 2: Floating Oil and Gas Production

You may interest:

Tuesday, February 17, 2009

Oil and Gas Processing (Oil Section)

Figure 1: Typical PFD of Oil and Gas Processing
The typical process flow diagram (PFD) of oil and gas processing for most of fixed or floating offshore production. Two sections consists crude oil stabilisation and associated gas compression.

Crude oil stabilisation section is processing the crude oil with export oil specification. The common export oil specification are true vapour pressure (TVP 100 kPa @ 50ºC) or reid vapour pressure (RVP 7psia @60ºF) and water content; basic sediment and water (BS&W) maximum at 0.5 vol%.

Typical arrangement of crude oil separation and stabilisation are; 3 Staage Separator (HP-MP-LP Separators) and Electrostatic Coalescer. An Inlet Heater is required at upstream of HP Separator. The outlet temperature is above emulsion breaking temperature to increase oil and water separation. The HP Separator separates oil, water and gas with 3-5 minutes residence time. The recommanded operating pressure for separators are: 10 bara (HP), 4.5 bara (MP) and 1.5 bara (LP)


Figure 2: Horinzontal 3-Phase Seaprator

The HP Separator, 3 phases (oil, water and gas) separation, horinzontal vessel with wier. Separation of oil from water relies on specific gravity. The gas goes to compression train, the water goes to Produced Water System, and the oil goes to Interstage Heater.

Interstage Heater further is heating oil to above wax dissolve temperature 75ºC. The oil send to MP Separator for further oil, water and gas separation. The oil send to LP Separator.

LP Seaparator stabilises oil as per requirement of TVP. The LP Separator may operates as 2 phase or 3 phase separation due to low water content in oil.

The oil from the LP separator is pumped via a low shear pump to the coalescer. The coalescer removes remaining water content in oil.

The BS&W and salt content of the oil is managed by the removal of produced water at each stage of the process and by the coalescer. The stabilised and dried crude then flows to the production tanks, via a crude cooler.

You may interest:
Oil and Gas Processing (Gas Section)