FPSO Contractor (2011-2013)
The statistics above is shown the fleet size of FPSO contractors in producing. Total FPSO is decreasing from 90 to 77 for year 2011 to 2013. All players, BW Offshore, SBM, MODEC, Bluewater, etc reduced number of fleet size, except Bumi Armada is increasing fleet size, from 2 units to 4 units.
Due to maturity of current oil field, number of un-chartered FPSO is increasing, anticipating a challenging ahead FPSO industry.
2011 FPSO Contractor
2012 FPSO Contractor
2013 FPSO Contractor
No comments:
Post a Comment